HOW TO Install Brick-STONE Veneer Without Mortar, Mess, or Delays
NEW INSTALLATION - NO FURRING STRIPS
INSTALLATION WITH FURRING STRIPS
WHY NOVABRIK? COLORS PROJECTS PRODUCT SPECS INSTALL GUIDE FRANÇAIS
Step-by-Step INSTALL GUIDE
1.
no furring strips
Install proper WRB over OSB sheeting per WRB manufacturer. No brick ledge or concrete foundation required.
1.
with furring strips
Install vertical furring strips or plywood sheathing as your mounting surface. No ledge or concrete footing required.
1.
NO MORTAR, NO DRYING TIME
2.
Start with the Starter Strip
Secure the starter strip at the base of the wall using screws. This provides a level base for your first row of bricks.
2.
Installs even
in freezing temperatures
3.
Stack Bricks Like LEGO™
Bricks interlock and stack without mortar. Screw every 4th course into the wall using standard fasteners. No mess. No waiting.
4.
Install Trim & Accessories
Add corners, end pieces, and trim. Everything is pre-molded to fit seamlessly.
5.
Enjoy Long-Term Performance
Novabrik is low maintenance, weather-resistant, and self-ventilated — built to last for decades in any climate.